Migrate to Capable Diagrams

Migrate to Capable Diagrams

You almost certainly have diagrams already. The point of migration is that they arrive editable rather than as flattened images, so the next person can still change them.


What can come across

From

Arrives as

Still editable

From

Arrives as

Still editable

draw.io / diagrams.net

A Capable draw.io diagram

Yes

Gliffy

A Capable draw.io diagram

Yes

Viadee BPMN

A Capable BPMN diagram

Yes

Stratus / Mermaid macros

A Capable text diagram

Yes

Pasted images

An attachment

No, there is no source to recover

Migration copies rather than moves. The original macros are left alone until you are satisfied, so a migration is reversible by doing nothing.


Everything in this section

Migrate from draw.io for Confluence

Existing diagrams, converted in place.

Run a migration

The five steps of the migration wizard, and what to do at each.

Migration results and re-runs

Reading the report, and fixing what failed.

Migrate from other diagram apps

Everything else, via import.


Related

extension

Bring them across editable, not as flattened pictures.

extension
extension